Tameside |
Preparations for stringing the overhead lines over the next few nights.
This gap still hasn't been joined yet though. At the Cemetery Road stop.
The second phase of the Droylsden Centre re-vamp is well under way.
The raised turn-back track just east of the Droylsden stop.
It was being cleaned with a fairly hefty vacuum cleaner.
Further east towards Audenshaw, nearly ready for the tarmac.
Thermite welding of the rail joint.
Tracks now laid at the Audenshaw stop, looking towards Ashton.
Lord Sheldon Way, Ashton. Re-bar on the M60 bridge.
Work is not so far advanced near Ashton town centre though.
Greenfield Station, Saddleworth.
Frenches Marina, Greenfield.
Frenches Marina, Greenfield.
The Huddersfield canal near Uppermill.
The canal and railway viaduct at Uppermill.
The library and information centre, Uppermill.
Near Mossley, clouding over now.